Required for ground mount, Permitted Development up to 1MWp in England
Generally Solar PV is a permitted development if the array size is less than 1megawatt, not on a national park or on a listed building.
In Scotland planning permission is a requirement above 50kWp.
Ground mounted solar arrays require full planning along with environmental and archeological survey and soil analysis.