Do I need planning permission for Solar PV

Required for ground mount, Permitted Development up to 1MWp in England

Generally Solar PV is a permitted development if the array size is less than 1megawatt, not on a national park or on a listed building.

In Scotland planning permission is a requirement above 50kWp.

Ground mounted solar arrays require full planning along with environmental and archeological survey and soil analysis.